Island system operation with high degree of renewable energy resources (RTI2018-100965-A-I00)

L. Sigrist E. Lobato M. Rajabdorri L. Rouco F.M. Echavarren

September 2019 - September 2022

Funding entity MCIN/ AEI/10.13039/501100011033/ “FEDER Una manera de hacer Europa”


This projects jointly addresses the operation planing and frequency stability. Both problems are intimately related in island power systems and operation planing taking into account frequency stability and its associated dynamics can lead to stabler and more efficient operation. Real island systems will be used to validate the methods developed.